The house is situated developed infrastructure environment: good public transport links and is close to school, kindergarten, parks and shops. The house is located 5 to 10 minutes to walk from the city center and 15-20 minutes from the seaside.
Box building: roof, decorative facade, balconies and railings, entrance doors;
External technical engineering communication networks connected to the city: water and sanitation, gas, electricity, exterior lighting areas;
Internal Communication Engineering: Water and sewerage, heating, electricity, ventilation, gas;
Stairwells, common hall, etc. with a full finish: stairway enclosures, floor tiles, painted walls, painted ceiling;
Apartments: the front door, leveled plaster, primed walls and ceilings, "black" carpet, plumbing with a full finish (floor and walls tiled, painted ceiling);
Plumbing WC: WC, wash basin, all kinds of meters.
Heating: gas boiler in each apartment, radiators, plumbing ventilation units.