The new facade of the House, is located on 1500 sqm large plot. Design of load-bearing walls built of brick, the floors from concrete. City heating, water supply and sewerage. The House has an elevator. Term of putting into operation: September 2003.
Floors: 7
Apartments: 7
Ceiling height: 2.60-3.00
Apartment area: 50.00-265.00 m²